conveyor interlock interlock (graphical LD)

suite id g_conveyor_interlock
domain manufacturing
language LD-graphical
difficulty medium
validation status validated
origin authored
license CC-BY-4.0

Authored for this suite to cover this domain with genuine control logic

What is proved

From benchmarks/manufacturing/g_conveyor_interlock/props.yaml. What each kind claims, and what it becomes on either route, is on The properties we prove.

id kind claim requirement
P1 invariant !(conveyor && estop) The conveyor must never run while emergency-stop is active.

Variants

file expected verdict violates method
clean.xml SAFE none expert
bomb.xml VIOLATION P1 fault-injection

Files

file what it is size sha256
benchmark.yml benchmark metadata 1.0 KB ddbd8e441ca9
bomb.xml ladder program, PLCopen XML 3.1 KB 45d48ef1ac73
clean.xml ladder program, PLCopen XML 2.7 KB 62c65df380f8
props.yaml property file 0.2 KB d7d55a88c756

Structured text, derived

Read off the ladder graph by runner/ld_to_st.py: every rung's contacts and coils rewritten as IEC 61131-3 assignments, in the same series/parallel logic the PLCopen XML encodes. This is a reading aid, not a second source of expected verdicts; ESBMC verifies the ladder program shown above, never this rendering.

PROGRAM g_conveyor_interlock_bomb
VAR_INPUT
    run_cmd : BOOL;
    estop : BOOL;
    guard_open : BOOL;
    maint : BOOL;
END_VAR

VAR_OUTPUT
    conveyor : BOOL;
    warn : BOOL;
END_VAR


conveyor := (((NOT estop OR (estop AND maint)) AND run_cmd) AND NOT guard_open);
warn := estop;

END_PROGRAM
PROGRAM g_conveyor_interlock_clean
VAR_INPUT
    run_cmd : BOOL;
    estop : BOOL;
    guard_open : BOOL;
    maint : BOOL;
END_VAR

VAR_OUTPUT
    conveyor : BOOL;
    warn : BOOL;
END_VAR


conveyor := ((NOT estop AND run_cmd) AND NOT guard_open);
warn := estop;

END_PROGRAM

Recorded runs

A task can carry two routes. ld is ESBMC's ladder front end reading the program directly. via C is the same solver reached through Beremiz and MatIEC, which is the only route that reaches ST, IL, FBD and SFC; see How ESBMC-PLC works.

  • g_conveyor_interlock__bomb (props.yaml, expected VIOLATION): v8.4 VIOLATION
  • g_conveyor_interlock__bomb__viac via C (props.yaml, expected VIOLATION): master VIOLATION
  • g_conveyor_interlock__clean (props.yaml, expected SAFE): v8.4 SAFE
  • g_conveyor_interlock__clean__viac via C (props.yaml, expected SAFE): master SAFE