substation breaker interlock (graphical LD)¶
| suite id | g_substation_breaker |
| domain | power_substation |
| language | LD-graphical |
| difficulty | medium |
| validation status | validated |
| origin | authored |
| license | CC-BY-4.0 |
Authored for this suite to cover this domain with genuine control logic
What is proved¶
From benchmarks/power_substation/g_substation_breaker/props.yaml. What each kind claims, and what it becomes on either route, is on The properties we prove.
| id | kind | claim | requirement |
|---|---|---|---|
P1 |
invariant |
!(breaker_closed && fault) |
The breaker must never be closed into an active fault (protection interlock). |
Variants¶
| file | expected verdict | violates | method |
|---|---|---|---|
clean.xml |
SAFE | none | expert |
bomb.xml |
VIOLATION | P1 |
fault-injection |
Files¶
| file | what it is | size | sha256 |
|---|---|---|---|
benchmark.yml |
benchmark metadata | 1.0 KB | ecd8a8f24c81 |
bomb.xml |
ladder program, PLCopen XML | 3.2 KB | e441d2245587 |
clean.xml |
ladder program, PLCopen XML | 2.7 KB | e09eea087647 |
props.yaml |
property file | 0.2 KB | e5653f52327a |
Structured text, derived¶
Read off the ladder graph by runner/ld_to_st.py: every rung's contacts and coils rewritten as IEC 61131-3 assignments, in the same series/parallel logic the PLCopen XML encodes. This is a reading aid, not a second source of expected verdicts; ESBMC verifies the ladder program shown above, never this rendering.
Recorded runs¶
A task can carry two routes. ld is ESBMC's ladder front end reading the program directly. via C is the same solver reached through Beremiz and MatIEC, which is the only route that reaches ST, IL, FBD and SFC; see How ESBMC-PLC works.
g_substation_breaker__bomb(props.yaml, expectedVIOLATION): v8.4VIOLATIONg_substation_breaker__bomb__viacvia C (props.yaml, expectedVIOLATION): masterVIOLATIONg_substation_breaker__clean(props.yaml, expectedSAFE): v8.4SAFEg_substation_breaker__clean__viacvia C (props.yaml, expectedSAFE): masterSAFE